Greater Cairo Metro Line 3
- Dilapidation survey and settlement analysis has been carried out including the following activities:
- Data collection for all the buildings along the tunnel and underground stations route.
- Calculation of the expected settlement of the neighbouring structures.
- Soil structure interaction analysis considering both soil and structures.
- Architectural, electrical, plumbing, fire fighting and structural design studies for 9 underground stations, annexed structures, cut and cover tunnel, shield-bored tunnel have been carried out using the most advanced analysis methods.
- The water tightness systems have been designed to suit the different elements of the project.
- Greater Cairo Metro Line 3