- Collection of the available data from the concerned authorities was followed by magnetic detection field works. Manual detection in some parts was carried out to verify the existing utilities and the new route planned for the diverted ones.
- Examination of interfaces between the new Metro line and other transportation modes to ensure full coordination.
- Analysis of the existing public transport system, public transport demand for the system area, rerouting strategy and infrastructure proposals have been studied.
- Study of the general traffic scheme during construction of the line.
- Greater Cairo Metro Line 3