Greater Cairo Metro Line 2
- Analysis of the existing public transport system, public transport demand for the system area, rerouting strategy and infrastructure proposals have also been studied. Moreover, the general traffic scheme during construction of the line was studied as well.
- Dilapidation survey and settlement analysis composed of the following activities:
- Calculation of the expected settlement of the neighbouring structures.
- Data collection for all the buildings along the tunnel and underground stations route.
- Soil structure interaction considering both soil and structures.
- Greater Cairo Metro Line 2