Cairo International Airport, Terminal 2
Between 1979 and 1984, ACE was involved in the engineering works for the development of Terminal 2 at the Cairo International Airport. The project consisted of the main terminal building, aprons, roads and car parks, in addition to all related infrastructure. The projects contract value was US$ 80 million.
Detailed works encompassed:
- Preliminary studies and feasibility study
- Preliminary and final designs including architectural, structural, water supply, drainage, electrical supply and interior/exterior road network (including external car parks)
- Supervision of construction