Galaa Tunnel
This tunnel, located in Giza, Egypt and executed in 1984-85, has a total length of about 600 meters, including its approaches.
The cross section of the tunnel consists of 2, two-lane carriage ways of seven meters width each, with a central median of 0.8 meters. Cast in-situ diaphragm walls have been adopted.
ACE scope of work:
- Planning
- Detailed design
- Construction supervision