Upgrading of Downtown Cairo Road Network
In Egypt, the government is constantly taking steps to alleviate the automotive pressure in the capital through upgrading the road systems. ACE played an important role in the upgrading of Cairos downtown road network (a total of 25 km length of roads) as part of Cairos underground Metro project between 1985 and 1987.
ACE scope of work:
- Pavement evaluation
- Recommendation of best upgrading scenario
- Tender documents
- Detailed design drawings
- Technical specifications
- Full supervision during construction