26th of July Corridor

This vital roadway connects the heart of Giza (El-Mohandessin district of Cairo, Egypt) to the Cairo-Alexandria desert highway.

The project, budgeted at 550 million Egyptian pounds, required the expertise of several different departments within ACE, and had to be executed within a very tight time-frame - only 6 months in 199798 for design and construction of the road which has a total length of 15 km and 28 bridges with different spans.