Agoona Junction - Elubo Road Rehabilitation, Ghana
Altogether, this 115 km road is now a 7.3 m wide carriageway with 2.0 m wide shoulders, and is sealed over most of the entire length of the road. The alignment is generally flat to rolling terrain and meets the design standards for a 100 km/hr road.
Our scope of work:
- Feasibility and economic viability studies
- Environmental and socio-economic impact assessment
- Preliminary engineering design
- Hydrological and drainage investigation
- Geotechnical and seismic studies for the entire road, bridges and other structures
- Detailed engineering designs for the road and bridges/overpasses
- Traffic management plan
- Cost estimates
- Tender documents