Dubai Light Rail Project
The main results for Stage 1 of the studies showed that the LRT project should be composed of two lines as per the following:
Red Line
- Total length: about 52 km
- Number of stations: 36 stations, including 2 corresponding underground stations
- Elevated part: 45.3 km, including 27 elevated stations
- Underground part: 4.7km, including 9 underground stations
Green Line
- Total length: about 17 km
- Number of stations: 19 stations, including 2 corresponding underground stations
- Elevated part: 5.8 km, including 11 elevated stations
- Underground part: 13.4 km, including 8 underground stations