Sidi Krir Thermal Power Plant
- Preparation of complete design packages for the ancillary buildings comprising:
- Guard house and guard towers
- Administrative building
- Restaurant and canteen building
- Warehouse and maintenance shop building (steel structure)
- Fire fighting station
- Garage and vehicle shop building
- Petrol station
- Preparation of detailed designs for the underground piping networks
- Structural steel connections design for all the steel buildings (quantity of steel is about 8,000 tons)
- Sidi Krir Thermal Power Plant