Rehabilitation and Reconstruction of 66 Bridges in Uganda
Second stage: Economic evaluation of bridges to be included in the rehabilitation programme in order to establish a priority list for phased rehabilitation, and the detailed technical design of Group II bridges.
ACE scope of work:
- Data collection and analysis
- Examination and assessment of the structural soundness and stability for the 66 bridges
- Preparation of preliminary calculations for drainage requirements, working stresses and loadings
- Preparation of preliminary cost estimate
- Estimation of the remaining useful life of the bridges
- Preparation of time schedule for the rehabilitation works