Agoona Junction - Elubo Road Rehabilitation, Ghana

Altogether, this 115 km road is now a 7.3 m wide carriageway with 2.0 m wide shoulders, and is sealed over most of the entire length of the road. The alignment is generally flat to rolling terrain and meets the design standards for a 100 km/hr road.

Our scope of work:
 
 1    2    3