Aswan Bridge
The foundations were constructed over piles with diameters of 1.2 m and lengths of around 40 m. A circular coffer dam having a diameter of 40 m was used to create the working area in the river during construction.
ACE scope of work:
- Preliminary studies and planning
- Survey works
- Tender documents and evaluation
- Design revisions
- Construction supervision